First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • icydefiance@lemmy.world
    link
    fedilink
    English
    arrow-up
    0
    arrow-down
    1
    ·
    1 year ago

    The cost of storing nuclear waste for a running plant is only a few hundred thousand a year; basically just just salary for a few people to transport it to a big hole in the ground.

    Decommissioning costs a few hundred million, which sounds like a lot, but for a project that lasts for decades it’s basically nothing.

      • sin_free_for_00_days@sopuli.xyz
        link
        fedilink
        English
        arrow-up
        2
        ·
        edit-2
        1 year ago

        The Department estimates that continued operation of the current fleet of nuclear power reactors could ~70,000 metric tons of uranium * increase the total inventory of spent fuel from 70,000 metric tons of uranium to 140,000 metric tons of uranium. Nearly all of this spent fuel is being stored at the reactor sites where it was generated, either submerged in pools of water (wet storage) or in shielded casks (dry storage). The Dept of Energy

        Those must be some big fucking trucks. And as far as I know, only Finland has actually developed any long-term storage which could be considered safe.